PT GROWTECH INDONESIA

PT GROWTECH INDONESIA
PT. GROWTECH INDONESIA

Experience List


No
NAMA PROYEK / PEMILIK
NO. KONTRAK / SPK
1
Pekerjaan Perencanaan dan Design Drawing Improvement Belt Conveyor
PT. Semen Indonesia (Persero) Tbk.
6600014417
2
Pengadaan Barang POT
PT. Wijaya Karya (Persero) Tbk.
TP.01.03/U.DEP.IP.TYN.0205/2013
3
Pengadaan Barang Coil untuk PT. Bangun Bejana Baja
PT. Wijaya Karya (Persero) Tbk.
TP.01.03/U.DEP.IP.TYN.0324/2013
4
Additional Brasing for Bridge Clarifier
PT. Ekamas Fortuna
44200801
5

Piping Work - ICA Chemical Grade Alumina Plant Tayan
PT. Wijaya Karya (Persero) Tbk.
TP.01.03/U.DEP.IP.TYN/0125/2013
6
Fabrication and Erection Chute and Liner
PT. Wijaya Karya (Persero) Tbk.
TP.01.03/U.DEP.IP.TYN/0126/2013
7
Change Order Main Pipe Line From Cooling Tower 444CT01
PT. Semen Gresik (Persero) Tbk.
12001862 – O4 - 2140
8
Perencanaan & Design Drawing Bulk Truck Unloading Station Pelabuhan Tuban - PT. Semen Gresik (Persero) Tbk.
11000289/HK.06/4033/12.11
9
FC4 (MM), Multimode
PT. Semen Gresik (Persero) Tbk.
12000209 – O3 - 21400
10
Change Order Mechanical Construction Paket 3C
PT. Semen Gresik (Persero) Tbk.
12002037 – O4 - 21400
11
Perencanaan & Design Drawing Flexibility 461BC3 TO 461 BC4A - PT. Semen Gresik (Persero) Tbk.
12000272/HK.06/4033/07.12
12
Renewal Bridge Clarifier Waste Water Treatment
PT. Ekamas Fortuna
46047146
13
Basic Engineering Design Feeing Bahan Baku & Produk Terak Tahun 2013 - PT. Semen Gresik (Persero) Tbk.
12012356/PP.02/4033/10.12
14
Fabrication and Erection of Piping System Pyroprocessing
PT. Semen Gresik (Persero) Tbk.
11000363.01/HK.06/6605/09.2011
15
Pengadaan dan Pemasangan Fire Alarm Electrical Room
PT. Semen Gresik (Persero) Tbk.
12000346 - O4 - 21400
16
Fabrication and Erection of Piping Hydrant System
PT. Semen Gresik (Persero) Tbk.
12000326 – O4 - 21400
17
Pengadaan dan Pemasangan IP Camera System
PT. Semen Gresik (Persero) Tbk.
11000755.01/HK.06/6605/01.2012
18
Mechanical BC at Jetty
PT. Semen Gresik (Persero) Tbk.
11000507.01/HK.06/6605/12.2012
19
Pembuatan Gudang C
PT. Bina Karya Prima
01/BKP KIG/02/2011
20
Pemasangan Pintu Radial Floodway Gate jumlah 2 Unit
PT. BARATA INDONESIA UUM TEGAL
057A/SPK/EXT/VII/2010
21
Pemasangan Pintu Radial Floodway Gate with Flap
Jumlah 2 Unit - PT. BARATA INDONESIA UUM TEGAL
056A/SPK/EXT/VII/2011
22
Pemasangan Pintu Radial Discharge Control Gate
Jumlah 2 Unit dan Guide Frame Stop Log
Jumlah 9 Set - PT. BARATA INDONESIA UUM TEGAL
047A/SPK/EXT/V/2010
23
Pemasangan Pintu Radial Floodway Gate Jumlah 3 Unit
PT. BARATA INDONESIA UUM TEGAL
044A/SPK/EXT/2010
24
Package Hydromechanical a,b,c & d (point 1-4)
PT. BARATA INDONESIA UUM TEGAL
TOTAL 7 - 10
25
Mechanical Construction Tuban II & IV
PT. Semen Gresik (Persero) Tbk.
10000221.01/HK.06/6605/10.2010
26
Repair Bucket Elevator & Conveyor of SST Berau
Ship Docking – PT. DOK dan Perkapalan Surabaya
VARIOUS
SPK BELUM TERBIT
27
Fabrikasi & Erection Pabrik Pengolahan Hasil Beras
Kadar Glichemic Rendah – PT. PETROKIMIA GRESIK
0937/LG.00.03/35/SP/2010
28
Desain dan Fabrikasi Loading Tower
PT. NUSA CIPTA SARANA
104/GT-03/PH/III/10
29
Pekerjaan Ducting H2 Gas Plant
PT. WILMAR NABATI INDONESIA GRESIK
179/WINA-GTI/PRO-HO/II/2010
30
Pekerjaan Struktur Baja Platform dan Ladder Rformer
PT. WILMAR NABATI INDONESIA GRESIK
161/WINA-GTI/PRO-HO/I/2010
31
Piping Work on Methylester Fractinations
PT. WILMAR NABATI INDONESIA GRESIK
172/WINA-GTI/PRO-HO/I/2010
32
Piping Work on Hydrochem Internal Plant
PT. WILMAR NABATI INDONESIA GRESIK
117/WINA-GTI/PRO-HO/IX/2009
33
Modificatin Internal Granulator & Scrubber
RFO II Project PT. Petrokimia – PT. WIJAYA KARYA
TP.02.01/DU.RFO.092/VI/2009
34
Fabrikasi & erection Modifikasi Internal Granulator
PT. WIJAYA KARYA
TP.02.01/DU.RFO.077/V/2009
35
Supply Bucket untuk Bucket Elevator
PT. WIJAYA KARYA
TP.02.01/DU.RFO.078/V/2009
36
Pekerjaan Strainer
PT. WIJAYA KARYA
SPB No. 849E11
37
RFO – PF II PT. PETROKIMIA GRESIK
PT. WIJAYA KARYA
TP.02.01/DU.RFO.057/III/2009
38
Engineering Material Handling PLTU 2 Sumut 2x25 MW
Amurung Sulawesi Utara – PT. WIJAYA KARYA
TP.02.01/D.Dep.Utilitas/PLTU
2.Sulut/329/VIII/2008
39
SANGA – SANGA COAL TERMINAL
PT. KYUNG SHIN CIPTA
108/Proc-PO/Sanga/VII/2008
40
PEMBANGUNAN GEDUNG FUTSAL
GRESIK SPORT CENTRE
015/GSC.01/VI/2008
41
0562615, Module Structure Pre Assembly C-Frame Flevo
Project – PT. SWADAYA GRAHA
000505/SPK.15P/09.2008
42
05P7001, Coal Handling System for PLTU – 1 – Rembang
Jawa Tengah 2 x (300-400 MW) – PT. SWADAYA GRAHA
000251/SPK.15P/05.2008
43
Fabrikasi & Erection Hydrant dan Fresh Water Line
PT. CARGILL INDONESIA
SB-001891
44
Tutul Coal Terminal
PT. KYUNG SHIN CIPTA
040/Proc-PO/KSC/III/2008

1 komentar:

  1. Yth
    Bapak Pimpinan
    Di Tempat,

    From:DENO ADAM
    Nomer HP :082226111637
    Perusahaan : PT.BINAMITRA MANDIRI SOLUSION
    (Jasa Penerbitan Bank Garansi & Asuransi)
    Alamat :Jl.Kayu Manis Barat No. 39 A1, Matraman Jakarta 13130
    Tlp : 021 8591 4350,8591 4351
    Fax : 021 8591 4353
    Email :denotegar93@gmail.com

    Sifat Dasar Usaha: MELAYANI PENERBITAN BANK GARANSI & ASURANSI (TANPA AGUNAN)

    Penjelasan Ringkas!!
    Surety Bond & Bank Garansi adalah suatu bentuk penjaminan dimana Surety ( perusahaan asuransi) atau Bank menjamin Principal ( kontraktor/ vendor/ supplier) akan melaksanakan kewajiban atas suatu prestasi/ kepentingan kepada Obligee sesuai kontrak/ perjanjian antara Principal dan Obligee.

    Jaminan Penawaran ( Bid Bond) : Menjamin Obligee apabila Principal yang telah dinyatakan sebagai pemenang tender tidak bersedia menanda tangani kontrak atau tidak dapat menyerahkan jaminan pelaksanaan dalam jangka waktu yang telah ditentukan oleh Obligee. Nilai jaminan berkisar antara 1 % sd. 3 % dari harga penawaran

    Jaminan Pelaksanaan ( Perfomance Bond) : Menjamin Obligee apabila Principal yang telah menandatangani kontrak pelaksanaan kerja, mengundurkan diri atau memutuskan kontrak secara sepihak atau bersama-sama dari kedua belah pihak yaitu antara Obligee dengan principal. Nilai jaminan berkisar antara 5 % sd. 10 % dari Nilai Proyek.

    Jaminan Uang Muka ( Advance Payment Bond) : Menjamin Obligee apabila Principal tidak dapat mengembalikan atau memperhitungkan uang muka yang telah diterima pada awal kontrak kepada Obligee sampai dengan proyek selesai.Nilai jaminan berkisar antara 10 % sd. 20 % dari Nilai Proyek.

    Jaminan Pemeliharaan ( Maintenance Bond) : Menjamin Obligee apabila Principal tidak melaksanakan kewajibannya memperbaiki kerusakan yang terjadi setelah pelaksanaan pekerjaan selesai sesuai ketentuan dalam kontrak. Nilai jaminan berkisar antara 5 % sd. 10 % dari Nilai Proyek.

    Periode Jaminan ( Insurance Period) : Jangka waktu Surety Bond sesuai dengan jangka waktu perjanjian / kontrak yang dibuat antara Penerima Jaminan ( Obligee) dengan Terjamin ( Prinsipal)

    Saya kenal dengan perusahaan ini dan ingin memberikan kemudahan.
    Kami Ada Solusinya. !!
    Kenalkan ke teman Anda.
    Ingin Menghubungi Perusahaan Ini.

    From :DENO ADAM
    Perusahaan :PT.BINAMITRA MANDIRI SOLUSION
    Alamat :Jl.Kayu Manis Barat No. 39 A1, Matraman Jakarta 13130
    Nomer HP :082226111637
    Tlp : 021 8591 4350,8591 4351
    Fax : 021 8591 4353
    Email :denotegar93@gmail.com

    BalasHapus